Bicycle Strategy
The Marrickville Bicycle Strategy builds on the previous (1996) Strategy, aiming to further improve conditions for cycling in Marrickville through a four point action plan consisting of:
- A bicycle network plan made up of high quality regional routes and more modest local connecting routes
- A bicycle parking plan which applies to the public domain, private developments, schools and Council facilities
- A plan for improving integration of cycling with public transport through provision of bicycle parking at railway stations and major bus stops, and by facilitating that cycling access to stations
- A plan for creating bicycle-friendly streets and neighbourhoods by ensuring that all of Council's roadway designs and works consider the needs of cyclists, e.g. cycling access through road closures.
The strategy also includes an implementation schedule for the Newtown to Petersham section of Regional Route 7, which is intended to serve as a pilot project to guide the implementation of the other Bicycle Strategy routes. The entire network would be implemented over ten years at a total estimated cost of $7.2M. It will however be necessary for Council to vary the timing of implementation according to available funding, local priorities and opportunities to fund works through other processes.
Further detail is included in the report to the 14 August 2007 meeting of Council's Technical Services Committee and within the Bicycle Strategy report itself. Both are available for download below.
If you would like a printed or electronic copy on CD, please contact the Customer Service Centre by phone on 9335 2222 or email council@marrickville.nsw.gov.au. All queries regarding the Bicycle Strategy should be directed to Council’s Transport Planner via the Customer Service Centre on 9335 2222 or email council@marrickville.nsw.gov.au
Download full strategy report
- Full Bicycle Strategy Report with maps (14MB, PDF - large download)
-
Report front cover (1MB, PDF)
Download in individual sections
Alternatively, the written Strategy report, maps and other images may be downloaded separately below:
- Report front cover (1MB, PDF)
- Bicycle Strategy Report without maps (3.8MB, PDF)
- Map 1 - Landform and barriers to movement (695KB, PDF)
- Map 2 - Landform and existing street network (790KB, PDF)
- Map 3 - Existing bicycle network (181KB, PDF)
- Map 4 - Proposed bicycle network (regional context) (647KB, PDF)
- Map 5 - Proposed bicycle network (local context) (189KB, PDF)
- Marrickville 2011: What will it look like? (1MB, PDF)
- Map 6 - Regional routes (north-south) (183KB, PDF)
- Map 7 - Regional routes (east-west) (184KB, PDF)
- Map 8 - Local routes (north-south) (183KB, PDF)
- Map 9 - Local routes (east-west) (182KB, PDF)
- Map 10 - Local routes (links) (183KB, PDF)
- Map 11 - Priority bicycle parking locations (237KB, PDF)
- Route implementation staging and cost estimates (55KB, PDF)
- Maps RD 1 - RD 11 - Local and regional route details (1MB, PDF)
- Map 13 - Bicycle network signage scheme (106KB, PDF)
-
Route RR07 - Regional Route 7 design package (2MB, PDF)
Links
-
Cycling in Marrickville
Resources, information and links for cycling in the Marrickville Council area.
-
Implementing the Bicycle Strategy
Visit the Your Council at Work section to find out more about upcoming and completed works on local cycleways.